The comprehensive speed-up of Gulei petrochemical project can be basically completed by the end of the first quarter of next year

In Quzhou and even Fujian Province, Gu Lei is famous for it!
The total investment of 18.8 billion yuan in the PX and PTA project of the Gure Petrochemical start-up project was settled in the Guleigang Economic Development Zone two years ago. This “best investment project in Ganzhou ever” has made Gu Lei the focus of the country and the world.
When the journalist’s reporter arrived at Gulei’s preaching meeting, an important meeting was being held in the city of Luzhou. The theme of the meeting was “Coordinating and Solving the Difficulties and Problems in the Construction of the Gulei Petrochemical Project”, attended by Party Secretary Chen Dong and Mayor Wu Hongqin.
In the eyes of Zeng Pingxi, deputy director of the Administration Committee of the Guleigang Economic Development Zone, “Cangzhou is promoting the construction of Gulei Petrochemical Project”.
The result is remarkable! Completed investment 13.738 billion yuan! Accounting for PX project total investment 97.63%! This is the latest two important data of the PX project, and is also the most important basis for the major media reports of "PX project construction speeding up."
Into the Gulei Petrochemical start-up project site, immediately felt an overwhelming construction scene.
On the construction site, there are many production facilities and auxiliary production facilities, such as storage tanks, distillation towers, and chimneys, which are several tens of meters to more than one hundred meters in height. The momentum of the large industries in the Gulei Petrochemical Area has been highlighted.
Zeng Pingxi said that in accordance with the requirements of the municipal party committee and the municipal government, the management committee of the Guleigang Economic Development Zone has provided full service for project construction, insisted on a weekly meeting, strengthened communication, and timely grasped the dynamics; actively took the initiative to provide on-site service and coordinate issues.
Regarding the progress of the petrochemical project, Xie Huaqing, director of the chairman of Tenglong Aromatic Quzhou Co., Ltd., felt that he was “very interested”. She said that in addition to the efforts of all levels of government, the design institutes, supervision units, and construction teams used by the project are all first class in China. The US UOP patented technology used by the project and the French AXSENS patented technology are the most advanced technologies.
In late December last year, after the successful lifting of the 124-meter-high heavy equipment xylene re-distillation tower in the Gulei petrochemical project, the construction of the Gulei petrochemical project entered the stage of full equipment installation. In order to speed up the progress, the petrochemical start-up area has stationed nearly 50 construction units and more than 2,000 construction personnel on the construction site. The construction of storage tanks, aromatic units, water treatment, thermal power plants and other major projects have been fully rolled out.
As of the end of July this year, the latest data shows that PX projects have completed a total investment of 13.784 billion yuan, accounting for 97.63% of the total investment in PX projects. The PX downstream project PTA also progressed smoothly. After the Shanghai Shunde Special Oil Project was officially started, more than 20,000 construction workers worked during the peak of the second half of last year. Currently, the project has completed investment of 3.576 billion yuan, accounting for 71.99% of the total investment.
At present, the trial production of petrochemical projects will take about 150 days. Chen Dong requested that Zhangzhou must win the pursuit and on the basis of significant achievements in the previous phase of project construction, he should work his way up, attack again, and do another 150 days to achieve a new breakthrough in the Gulei petrochemical project campaign, promote leapfrog development, and benefit the people of Ganzhou.
The two major projects can be basically completed by the end of the year and put into operation in the first quarter of next year. The Gulei Petrochemical Industrial Park will also build an oil refinery with an annual output of 15 million tons, an ethylene plant with an annual output of 2 million tons, utilities, terminals, and midstream and downstream plants, with a total investment of about 100 billion yuan. By 2015, the Guleigang Economic Development Zone will achieve an annual refining capacity of more than 20 million tons and an annual production value of up to 220 billion yuan.
In the eyes of the local people, their most direct benefit is that the Gulei petrochemical project has promoted an unprecedented improvement in the local infrastructure. Before the project is put into production, all local residents will be resettled in the northern Xingang City 800 meters away. Roads and other major roads have been expanded, and all land acquisition and demolition have been carried out according to the highest national standards. To date, more than 60 local university graduates have received training and will embark on a project production line in the future.
In addition, in order to meet the requirements for landing the project, the construction of piers, water supply, land reclamation, and solid waste disposal sites in the development zone have all started construction. Driven by the petrochemical project, a large number of petrochemical downstream projects or other projects have gradually entered Gu Lei. There are more than 40 Taiwan-funded projects under tracking.
“One of the two petrochemical bases in the province” “a new growth area in the province”, Zhengli University in Guleigang Economic Development Zone has advanced step by step.

Heavy Steel Fabrication


Coeffort has been supplying steel equipment, structure manufacturing and Installation service from the year of 2013. We focus on producing the highest quality mechanical steel structures and conveyor equipment with advanced steel fabrication processes and machinery. Our commitment to quality metal products, superior customer service and ability to manufacture and assemble has earned us the trust and recognition from our clients in Australia and Asian countries.


Coeffort's Fabrication Service includes but is not limited to:

  • Structure Engineering Design and Shop detailing services
  • Industrial Conveyors, belt conveyor, Chain Conveyor, Bucket Elevator, Screw Conveyors etc.
  • Solid / Liquid Separation Machine, Thickener and Vacuum Belt Filters
  • Heavy industry workshop building structures
  • Industrial process plant buildings, trusses, trestles.
  • Mining equipment, plate works (chutes, hoppers, bins, tanks etc.)
  • Non-pressure vessel/tanks.
  • Pipe spools fabrication.
  • Steel Structures & Equipment Installation



Our facility and production capabilities include:

  • 15,000 m2 purposed- built Factory.
  • Approximately 50 staff capable of factory work
  • Overheads Cranes with Maximum capacity of 32 Tons, height under the hook of 8m
  • CNC Cutting Machine, Shearing Machine ,Bending & Rolling Machine etc.
  • Shot and Sand Blasting Machine with painting facilities


Quality Control System

We are ISO9001 qualified workshop.

DOC Control as per in-house procedures.

MDR Doc – ITP, Raw Material Traceability, Welding Procedure, Welder Qualification, NDT, Dimension and Trail Assembly Report, Painting Inspection, are our standard QA docs.

Welding Quality Control

Welding Standard: AWS D1.1, AWS D1.6, or other International Standard

Welder Qualification: certified as per AWS

AWS Certified Welding Inspector (CWI)

Painting Quality Control

We have contracted Painting inspector with NACE II qualification to guarantee painting surface preparation and painting quality.


Our aim is to be a leading customized steel equipment manufacturing supplier in China through our strict QA systems.



Our Facility

Facility 1


Heavy Steel Fabrication,Steel Building Fabrication,Steel Bridge Fabrication,Steel Duct Fabrication

Quantum Conveying Systems Yangzhou Co.,Ltd. , https://www.ycectech.com