Construction Unit: Fuping County Education and Sports Bureau Postal address: Middle Section of National Highway 107, Zhumadian County, Henan Province Post Code: 463100
Leisuwash specializing in manufacture Automatic Car Wash Machine, Touchless Car Wash , Automatic Touchless Car Wash, touchless car wash equipment, robot car wash, smart car wash system, leisuwash 360, leisuwash leibao 360, laserwash 360, leisuwash touchless car wash machine, leisu wash touchless car wash automatic, leisu wash 360 high pressure touchless car wash equipment, robo car wash, touch free car wash, leisuwash 360 touch free car wash, leisuwash 360 price, automatic car wash price, leisuwash in malaysia, no touch automatic car wash machine.
Leisuwash 360 touchless car wash machine high intelligent high quality, with car wash + car care + drying process totally, each car wash takes time 1 minute to 5 minutes which depends on the car wash mode.
Leisuwash 360 car wash automatic touchless is distinguished by the use of new, more advanced American technology of Automatic Car Wash. The 3D technology of washing is based on the use of a special bent-shaped manipulator with 360 rotations. Rotating around the car, the manipulator reads data about its contours and adjusts itself to the optimum distance for washing.
Automatic Car Wash Machine,Leisuwash 360 Glow,Car Wash Machine,Vehicle Washing Machine Hangzhou Leisu Cleaning Equipment Co.,Ltd , https://www.sdleisuwashtouchless.com
Project Introduction:
The project is located south of Danzhu Road, Zhumadian, Henan, north of Hexin Road, east of Xuanling Street, west of the substation, an educational development, with a total construction area of ​​60,000 square meters, including: teaching buildings, laboratory buildings, libraries, and dormitories. Cafeteria and playground.
The total investment of the project: 60 million yuan.
Contact: Wang Suizhu Telephone, 4922663
Project Name: Zhumadian Fuping County Luohe Middle School New Campus Construction Project Progress: Engineering Design and Construction Period: April 2012 - November 2013 Major equipment: fire fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting Facilities, cranes.
Related Developments: Tower Crane Infrastructure Project