The project construction period is from 2009 to 2010, with a total investment of 290 million yuan. It is currently undergoing approval. The scale of this project is to produce 5,000 tons of special high-quality PTFE dispersion resin per year. The key equipment includes filter press, dryer, cooler, DCS distributed control system, automatic instrumentation, water treatment equipment, cracking furnace, cracking and compression. Machine, reactor, extruder, decomposition system tower.